Light Manufacturing For Lease
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Tustin (Inland Empire-Orange County Line - Southern California Regional Rail Authority (Metrolink), Orange County Line - Southern California Regional Rail Authority (Metrolink)) | 12 min | - | 6.9 mi |
| Santa Ana (Inland Empire-Orange County Line - Southern California Regional Rail Authority (Metrolink), Orange County Line - Southern California Regional Rail Authority (Metrolink)) | 13 min | - | 8.2 mi |
| Airport | Drive | Walk | Distance |
| John Wayne/Orange County | 3 min | - | 1.3 mi |
| Long Beach (Daugherty Field) | 30 min | - | 22.3 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 8 |
| Type: | Surface |
| Included in Rent: | Yes |